Minutes approval for 11/2/22 meeting.
Reduction in Setback SAS to property line; 10' required, 6' proposed. SAS to foundation; 20' required, 11' proposed septic tank to slab foundation; 10' required, 6' proposed. Soil absorption more than 36" from finish grade. A vent proposed for mitigation. Plans designed by Mark Farrell -Green Hill Engineering - Received 11/15/22.
Request to use sieve analysis instead of a perc test. Plans designed by Mark Farrell - Green Hill Engineering-Received 11/1/22
To allow for a single compartment tank instead of the required 2-compartment tank. Plans designed by Margaret Bacon - Civil Site Engineering - Received 8/24/22.
Request to use sieve analysis instead of a perc test. Plans designed by Jason Dubois -DC Engineering- Received 11/20/22
Request to use sieve analysis instead of a perc test. Plans designed by Jason Dubois -DC Engineering- Received 11/21/22
Vote to appoint regional health inspector, Douglas Mercurio, as an agent of the Board
the Board will discuss potential fees for paper applications, as the department is aiming to process permits solely through the online system.
Director Rike Sterrett will discuss topics related to COVID-19, shared services grant, and office updates.